The lift well KIT has 4 external walls and a central core.
Each of the 5 pieces are installed and moved as one-piece with the crane.
First of all, place the central core.
After assembling the iron cage, assemble the 4 external walls by fastening them with tie rods and butterfly nuts.
Then, pour the concrete, do this slowly, mainly at the formwork base.
To dismantle it, first unthread the tie rods and remove the 4 external walls. Afterwards, screw in the relevant bolts to tighten the central core so it can be removed with the crane and repositioned for the following casting. |
 |